Documented projects where 3D concrete scanning replaced chiselling, saved weeks of programme time and de-risked the decision.

Rebar and cover mapped without a single drill hole
42%
Lower total project cost
40%
Less structural engineering time
Projects
Browse the cases.
Bridges
Trøndelag fylkeskommune
Post-tensioned road bridge
Post-tension cables had to be located without risking damage from chiselling.
2–5 weeks saved
≈ NOK 550 000 saved
Read the case →
Bridges
Rogaland fylkeskommune
Lower Haugland
Mapping of concrete cover on top reinforcement in a bridge deck to determine how much of the deck can be milled away without damaging the reinforcement during rehabilitation.
1-2 weeks saved
NOK 100.000-150.000 saved
Read the case →
Bridges
Trøndelag fylkeskommune
Slab bridges
Mapping of general reinforcement in the bridge deck for calculating the bridge’s capacity.
6-12 weeks saved
NOK 1M-5M saved
Read the case →