Bridges

Post-tensioned road bridge

Trøndelag fylkeskommune — Post-tension cables had to be located without risking damage from chiselling.

Post-tensioned road bridge

3 hours

In field

2–5 weeks

Time saved vs. traditional inspection

≈ NOK 550 000

Cost saved vs. chiselling

The challenge

The client needed information about post-tension cables and general reinforcement in selected areas of a bridge. Chiselling carries a high risk of damaging tension cables, repairs after chipping can create weak points, and only a limited area can be inspected that way.

What we did

Birdsview scanned the bridge in 2–3 hours across the selected areas and delivered a full 3D model with rebar mapping and post-tension cables.

“Birdsview provides an accurate and efficient solution for mapping reinforcement and concrete cover, giving us a significantly better foundation for precise maintenance planning.”

Peter Skjerstad, Bridge Inspector, Trøndelag fylkeskommune

Delivered with Trøndelag fylkeskommune