Trøndelag fylkeskommune — Post-tension cables had to be located without risking damage from chiselling.

3 hours
In field
2–5 weeks
Time saved vs. traditional inspection
≈ NOK 550 000
Cost saved vs. chiselling
The challenge
The client needed information about post-tension cables and general reinforcement in selected areas of a bridge. Chiselling carries a high risk of damaging tension cables, repairs after chipping can create weak points, and only a limited area can be inspected that way.
What we did
Birdsview scanned the bridge in 2–3 hours across the selected areas and delivered a full 3D model with rebar mapping and post-tension cables.
“Birdsview provides an accurate and efficient solution for mapping reinforcement and concrete cover, giving us a significantly better foundation for precise maintenance planning.”
Delivered with Trøndelag fylkeskommune