Buildings
The station
GC Rieber — The thickness and reinforcement bars in the floors and walls of The Station were documented and mapped. At the same time, the culverts under the floor were surveyed.
3-6 weeks saved
NOK 250.000-500.000 saved
The challenge
The thickness and reinforcement bars in the floors and walls of The Station were documented and mapped. At the same time, the culverts under the floor were surveyed.
“Chiselling up the floor would have caused disruption for the tenant, a lot of noise, and damage to the floor. By using Birdsview, it was possible to minimise destructive interventions and avoid inconvenient shutdowns.”