Airports
Kjevik Airport
COWI — Identified the need for reinforcement measures, as well as what level of reinforcement was sufficient.
2-3 weeks saved
NOK 400.000-500.000 saved
The challenge
Identified the need for reinforcement measures, as well as what level of reinforcement was sufficient.
“We were very satisfied with the site inspection and the results from Birdsview at Kjevik Airport.”
