Airports

Kjevik Airport

COWI — Identified the need for reinforcement measures, as well as what level of reinforcement was sufficient.

2-3 weeks saved

NOK 400.000-500.000 saved

The challenge

Identified the need for reinforcement measures, as well as what level of reinforcement was sufficient.

“We were very satisfied with the site inspection and the results from Birdsview at Kjevik Airport.”

Audrius Dasevicius, Civil Engineer at COWI